Headline result: Around 60% of the fleet suitable for an electric option today.
At a Glance
Organisation: Outer metropolitan council
Fleet: ~110 fleet assets
Suitable now: Around 60%

The Situation
The council had significant decarbonisation and net zero commitments. It needed a fleet transition plan to understand the cost of electrifying and decarbonising its fleet while meeting operational requirements.
The Constraint
The initial cost model favoured diesel utes because the specifications assumed heavy towing. Those specifications did not always reflect the job each vehicle actually performed.
What We Did
We compared specified requirements with observed usage and staff operating needs. We then shortlisted vehicle options against real duty cycles and modelled a staged replacement pathway.
What We Found
Only a small share of the utes regularly towed. Daily operating distances were generally within the range of available electric options, subject to payload, towing and charging requirements.
Assessing each vehicle on its real duty cycle showed around 60% of the fleet was suitable for an electric option today.

What We Recommended
Prioritise battery-electric options where a suitable model meets the job. Consider plug-in hybrids where towing is confirmed. Check the exact variant, payload after fit-out, operating range under load and vehicle mass requirements before committing.