Electric vehicles are no longer just about replacing the fuel bowser with a charging cable. The next phase of fleet electrification is about turning those vehicles into energy assets, and Vehicle-to-Grid (V2G) technology is the key. With ARENA's National Roadmap projecting that V2G could meet more than a third of the National Electricity Market's storage requirements, the question is not whether V2G will matter for fleets, it is whether your fleet will be ready when it does.

What V2G Means for Fleet Operations
At its core, V2G is straightforward: bidirectional charging that allows electric vehicles to export power back to the grid, not just draw from it. Where traditional EV charging is one-way, V2G-enabled vehicles can push stored energy from their batteries into the electricity network when it is needed most, typically during peak demand periods when wholesale prices spike. V2G sits alongside its cousins V2H/V2F (vehicle-to-home or vehicle-to-facility) and V2L (vehicle-to-load), but for many organisations V2G is the big prize.
Fleets are the killer app for V2G. Fleet EVs often spend a significant portion of their time parked, an enormous battery capacity sitting idle. Combine that with predictable schedules, centralised depot charging and professional fleet management systems, and you have the perfect conditions for V2G participation. Council vehicles, delivery vans and waste collection trucks are prime candidates.
The Opportunity for Australian Fleets
The numbers are compelling. ARENA's modelling suggests that if just 10% of the projected 1.5 million EVs on Australian roads adopt V2G by 2030, they could meet 37% of the National Electricity Market's storage requirements. As ARENA CEO Darren Miller puts it: by the early 2030s, EV battery capacity is projected to outstrip all other forms of energy storage in the NEM.
For individual fleets, the value proposition breaks down into four categories: revenue generation through grid services, demand response programs and wholesale energy market arbitrage (UK studies estimate potential returns of around AU$1,800 per vehicle annually); reducing costs by charging when electricity is cheap; avoiding network and infrastructure upgrade costs; and improving energy resilience at depots.
Global Proof Points – It's Already Happening
V2G is not theoretical. In the United States, school bus fleets have emerged as the poster child for V2G economics, with Highland Electric Transportation and Nuvve demonstrating that school buses are almost purpose-built for the technology; in one trial, a single school bus generated US$23,500 in V2G revenue. In the UK, waste collection vehicles have been identified as ideal candidates, and Denmark's Nuvve has been running commercial V2G operations for over four years.
Closer to home, Australia is getting serious. AGL's landmark V2G trial, launching January 2026 with Hyundai, Kia, BYD and Zeekr vehicles, represents the first major trial with explicit OEM warranty guarantees, addressing one of the biggest historical barriers to adoption. Origin Energy and Amber Electric are also running trials.
The Barriers – Let's Be Honest
Fleet managers are paid to be realistic, not optimistic, and V2G has real barriers. Vehicle availability remains limited and the CCS standard (ISO 15118-20) is still being deployed. Bidirectional chargers run AU$6,000 to $10,000-plus before installation. Regulatory complexity varies by state, and revenue models remain immature.
Then there is the elephant in the room: battery degradation. The evidence is more nuanced than the horror stories. Research from UTS and German field trials indicates V2G adds only around 0.3% additional degradation per year with intelligent management, and some studies show V2G can improve battery health through optimised charge cycles. The warranty question has historically been the killer, but AGL's trial, with explicit warranty assurances from participating manufacturers, may finally break this logjam.
A Roadmap for Fleet Managers – Start Now
V2G is not ready for mass deployment today, but the window to prepare is open, and first movers will have advantages. A staged approach works best.

Stage 1: Assess Your V2G Suitability (Now)
Analyse your fleet's daily schedules and identify vehicles with extended depot dwell times and predictable, route-based operations. Review your depot's electrical infrastructure capacity and understand your current peak demand profile.
Stage 2: Procure V2G-Ready (2026-2028)
When procuring new EVs, prioritise models with bidirectional charging capability and request explicit OEM confirmation on V2G warranty positions. Consider V2G-ready infrastructure even if you are not immediately deploying bidirectional chargers; future-proofing now is cheaper than retrofitting later.
Stage 3: Engage Your Energy Partners (2027 onwards)
Talk to your electricity retailer about time-of-use optimisation and emerging V2G programs, engage with your DNSP about grid export requirements, and monitor utility V2G trials for lessons and commercial offerings.
Stage 4: Pilot and Scale (2027 onwards)
Start with a small pilot to build internal capability and understand the operational realities. Partner with aggregators who can manage the complexity of grid participation. Document learnings rigorously.
Stage 5: Optimise and Monetise (2028+)
Scale V2G across your fleet as vehicles and chargers are replaced. Integrate V2G into whole-of-life cost modelling. Position your fleet as a strategic energy asset, not just a cost centre.
Questions Every Fleet Manager Should Ask Today
Before your next procurement cycle, ask: which vehicles in my fleet have the longest daily dwell times? What is my depot's current electrical capacity, and what would bidirectional charging require? Which OEMs can guarantee warranty protection for V2G participation? What V2G trials or programs are my energy retailer and DNSP planning? How would V2G participation impact our whole-of-life cost modelling?
Originally posted on Fleet EV NEWS
Final Thought: The Time to Prepare Is Now
V2G represents the next evolution: the transformation of fleet vehicles from cost centres into strategic energy assets that can reduce operating costs, generate revenue and support grid resilience. For fleet managers willing to start the conversation with their procurement teams, their energy retailers and their OEM partners, the opportunity is real. The only question is: will your fleet be ready?
For a transition plan tailored to your organisation, explore our Corporate Fleets and Councils & Government advisory pages.