The challenge

Public value. Operational rigour.

[ 01 ]

Operational requirements first

Test vehicle suitability against real routes, payloads, shifts, operational requirements and replacement cycles.

[ 02 ]

Auditable decisions

Document assumptions, option criteria, risks and costs for internal governance and procurement review.

[ 03 ]

Depot readiness

Assess charging demand, dwell windows, site constraints and the pathway to qualified electrical design.

[ 04 ]

Deliverable sequencing

Phase vehicles, charging and organisational change around budgets, tenders and operational readiness.

[ 05 ]

Policy development

Evolve traditional fleet policies to support a scalable EV fleet, including vehicle selection, charging and operational responsibilities.

[ 06 ]

Economic and emissions pathways

Ensure transitions align with economic realities and mandated emissions reductions, including multiple transition scenarios.

Council experience

We possess significant experience in delivering fleet transition services for councils.

“We'd be happy to recommend them to other entities looking at EV Fleet Transitions”
Clinton Kleynhans, Manager Built Environment & Operations, Shire of Mundaring
Council case studies

Plans built for adoption.

Outer Metro Council — 110 Fleet Assets

  • About 60% of the fleet was assessed as suitable for an electric option at the time of the study.
  • Only a small share of utes towed; the highest average daily distance across the fleet was 127 km.
  • Vehicle options were assessed against real duty cycles rather than maximum brochure specifications.

Modelled findings and recommendations from a SolSombra study, 2025 to 2026. Organisation not named.

Read case study →

Regional Council — 80+ Fleet Assets

  • For a depot of 10 to 15 vehicles, the plan specified seven dual-port 22 kW AC chargers and one 60 kW DC charger.
  • Load management was estimated to defer $20,000 to $150,000 of backbone electrical works per site.
  • Charging was sized from real energy use, with early grid connection planning recommended. Vehicle suitability was not assessed in this scope.

Modelled findings and recommendations from a SolSombra study, 2025 to 2026. Organisation not named.

Read case study →

See our case studies for more examples of our work →

[ Common questions ]

Council procurement, answered.

Yes. Engagements are scoped and documented to fit council procurement requirements, including quotes, panels and tender responses where applicable.